The Building & Other Construction Workers’ Welfare Cess (BOCWW Cess) is a levy imposed on the construction costs incurred by employers for building and other construction activities. As per Section 2(1)(d) of the Building and Other Construction Workers (Regulation of Employment and Conditions ofRead more
The Building & Other Construction Workers’ Welfare Cess (BOCWW Cess) is a levy imposed on the construction costs incurred by employers for building and other construction activities.
As per Section 2(1)(d) of the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996, read with Section 2(d) of the Building and Other Construction Workers’ Welfare Cess Act, 1996, the term “building or other construction work” has a broad scope. It includes activities such as construction, alteration, repairs, maintenance, and demolition related to various structures, including buildings, streets, roads, railways, airfields, irrigation systems, drainage works, flood control projects (including stormwater drainage), power generation and distribution, waterworks, oil and gas installations, electric lines, telecommunication networks, dams, canals, tunnels, bridges, pipelines, transmission towers, and cooling towers. The government may also specify additional construction works through notifications. However, it excludes any construction activities covered under the Factories Act, 1948, or the Mines Act, 1952.
The BOCWW Cess is imposed on the total construction cost incurred by employers. As per Sections 3(1) and 3(3) of the Building and Other Construction Workers’ Welfare Cess Act, 1996, along with Notification No. S.O. 2899 dated 26.09.1996, the cess is charged at 1% of the total construction cost.
See less
As per Section 3(1) of the Act, labour cess is levied at 1% of the "cost of construction." Cost of Construction Includes (Rule 3 of the Cess Rules, 1998) ✅ Material Cost – Cost of raw materials used in construction✅ Labour Cost – Wages and salaries paid to workers✅ Hire Charges – Rent for machineryRead more
As per Section 3(1) of the Act, labour cess is levied at 1% of the “cost of construction.”
Cost of Construction Includes (Rule 3 of the Cess Rules, 1998)
✅ Material Cost – Cost of raw materials used in construction
✅ Labour Cost – Wages and salaries paid to workers
✅ Hire Charges – Rent for machinery and equipment
✅ Architectural & Design Fees – Payments to consultants, engineers, and designers
✅ Contractor’s Bills – Total contract value for civil work
Cost of Construction Excludes
❌ Land Cost – Purchase price or lease rent of land
❌ Compensation to Workers – Paid under the Workmen’s Compensation Act
❌ GST Component – Indirect taxes levied under GST
Labour Cess on Supply and Service Cost with GST